Every commercial building area needs a parking lot for easy access and the safety of people’s vehicles. Many people come to us and ask about the project’s timeline. Today, we will break down the process to give you a clear idea of what to expect. Of course, every project is different, but we will guide you about asphalt paving.

Building a parking lot might seem straightforward, but there’s more to it than meets the eye—especially when using asphalt paving. Before any construction begins, it’s essential to determine the size and scope of your parking lot. Factors such as the number of spaces needed, traffic flow patterns, and any special requirements must be considered.

Planning and Designing Your Parking Lot

An important first step is evaluating the site where the parking lot will be built. This includes assessing the terrain, drainage patterns, soil conditions, and any existing infrastructure that may affect the layout and construction process.

Once the site evaluation is complete, the next step is designing the parking lot’s layout. This involves planning the arrangement of parking spaces, driveways, entrances, exits, and any necessary markings or signage. The goal is to maximize space efficiency while ensuring smooth traffic flow and safety.

Preparing the Groundwork

If there’s an existing structure or pavement on the site, it needs to be demolished and cleared away. This can include old asphalt, concrete, vegetation, or any other obstacles hindering construction.

Grading is the process of leveling and shaping the ground to ensure proper drainage and a solid foundation for the parking lot. Excavation may also be necessary to adjust the terrain and accommodate the desired slope for water runoff.

Once the ground is properly graded and excavated, a sub-base layer is installed. This typically consists of aggregate materials like gravel or crushed stone compacted to create a stable base for the asphalt pavement.

Installing the Asphalt Surface

The actual paving process begins with the application of the asphalt mixture. This is done using specialized equipment to ensure an even and smooth surface. The thickness of the asphalt layer will depend on factors such as expected traffic load and climate conditions.

After the asphalt is laid down, it must be compacted to achieve optimal density and durability. Compaction reduces air voids within the asphalt mixture, enhancing its strength and resistance to cracking under heavy use.

Once the asphalt pavement is compacted, finishing touches are applied. This may include striping for parking spaces, directional arrows, handicap markings, and any necessary signage. These markings not only guide drivers but also ensure compliance with safety regulations.

Curing and Maintenance

After installation, the asphalt pavement needs time to cure and harden. This typically takes a few days, depending on weather conditions. During this period, it’s important to restrict traffic to allow the asphalt to be set properly.

Regular maintenance is crucial to prolong the lifespan of your parking lot. This includes periodic inspections for cracks, potholes, or drainage issues, as well as routine sealcoating to protect the asphalt from moisture and UV damage.

Properly constructed and maintained asphalt parking lots can last for decades. However, heavy traffic, harsh weather, and lack of maintenance can impact longevity. By staying proactive and addressing any issues promptly, you can ensure your parking lot remains safe, functional, and visually appealing for years to come.

Weather Consideration

Weather significantly impacts the timeline for completing a parking lot or any asphalt paving project. Rainy weather and extreme cold can delay or halt paving altogether because asphalt needs dry conditions to adhere properly. Ideally, asphalt can cure overnight in favorable weather, ensuring a quick turnaround.

However, curing may take 2-3 days to achieve the necessary hardness and durability when temperatures drop. It’s crucial to schedule paving during dry, mild weather to avoid complications and ensure the asphalt sets correctly. By planning around weather conditions, contractors can deliver a finished parking lot that meets quality standards and lasts longer against the elements.

How to Choose the Right Contractor?

When selecting an asphalt paving contractor for your parking lot project, take the time to research and read reviews. Look for contractors with experience in commercial paving and a reputation for quality workmanship. Obtain quotes from different contractors to compare prices, services, and timelines. Be wary of unusually low bids, which may indicate subpar materials or workmanship.

Clear communication is key to a successful project. Discuss your expectations, timeline, and specific requirements with your chosen contractor upfront. A reliable contractor will inform you throughout the process and promptly address any concerns.

Why Us?

We are a local paving company in Virginia. We handle all types of asphalt and tar & chip paving for both commercial and residential projects. Our work includes roadways, parking lots, and driveways of all sizes. At Standard Asphalt Paving Company, we pride ourselves on our professionalism, honesty, and top-quality craftsmanship. Contact us now to discuss your project in detail.